Old Town

Burj Dubai Development Old Town Site B, Phase-2 for EMAAR Properties
Project Manager : M/s. Mace International Ltd.
Consultant : M/s. Allied Consultants

Complete Electrical Works including lighting, small power installation, switch board installation, Fire alarm system, Central Battery system, Card Access system, UPS system, CCTV System, ATS Panel, Diesel Generator sets (500KVA – 2 Nos, 425KVA – 4 Nos & 390KVA – 1 No.) etc. Burj Dubai Development, Old Town, Site A, Phase-1 (9 Buildings with common Basement) for EMAAR Properties PJSC.

Project Manager : M/s. Mace International Ltd.
Consultant : M/s. Allied Consultants

The project involves complete Electrical works (Connected Load : 13 MW) including lighting / small power, installation of 9 Nos. 2500A MDB’s, Fire Alarm system, Central Battery System, Video Intercom system, Access Control system, CCTV system, BMS System, Gate Barrier system, ATS Panel, Generator installation (250KVA-2 Nos, 350KVA-1 No., 370KVA-1 No. & 400KVA-1 No), UPS System and Structured cabling system etc.