Foremarke School

Foremarke School on Plot No. 8T-G-010 Al Barsha – Dubai for M/s. Evolvence Knowledge Investments;

This school is located at Al Barsha – Dubai. A total built-up area of 254,687.00 sq.ft. consists of two buildings such as Foundation School (G+1) and Junior School (B+G+2). BILT Middle East LLC was appointed to undertake the complete Electrical, Air Conditioning, Plumbing, Draining and Fire Fighting services for this project. MEP Consultant for this project is M/s. Alliance Design Group Consulting Engineers (ADG).

Following Electrical services were provided by BILT Middle East LLC :-

  • Electrical installation with a total connected load of approx. 2242.25 KW (2 Nos 1500 KVA Transformer)
  • 1 No 100 KVA prime rated Generator and associated works.
  • Fire Alarm and Voice Evacuation System.
  • Self Contained Emergency Lighting System with monitoring.
  • Voice & Data Structured cabling passive network system.
  • Lightning Control System.
  • CCTV System.
  • Access Control System and Gate Barriers Automation System.
  • UPS System.
  • Earthing & Faraday cage lightning protection system.

Client/Consultant

Client : M/s. Evdveve Knowledge Investments
Consultant : M/s. ADG