Emirates Call Centre

Bill Middle East was appointed to undertake complete Air conditioning, Electrical, Plumping, Drainage,& Fire Fighting Works which comprised of 6 Nos 1500KVA Transformers, 6 Nos 400KVA UPS, 4 Nos 1600KVA Prime rated Standby Diesel Generator Sets, 2 Nos. 221 Tons Chillers, Chilled Water Pumps (Primary, Secondary & Teritary), FAHUs, AHUs, FCUs, Fire Fighting Pumps (Electric, Diesel & Jockey), Booster Water Pump sets, ATS, 2 Floor Dedicated DATA Centre with CCUs & AHUs, Power Distribution with RCBOs and 8 floors Dedicated Call Centre with DATA, Voice and Power console Desks, 2 Nos. 300KVA UPS For Call Centre, Fire Fighting Sprinkler system, Inergen system, HS SD System, Fire Alarm and Central Battery system etc.
 

Client/Consultant

Client : M/s. Emirates Airlines