Citywalk


The City Walk Residential Development is located in Al Wasl (near Jumeirah) Dubai, UAE, just west of Sheikh Zayed Road and Down Town Burj Khalifa.

The project occupies a land area of approximately 125hs and comprises 21 medium sized residential buildings constructed on 9 separate plots. The buildings which will be linked via a main promenade providing pedestrian access to retail units located on the ground floor of each building. Each building is between six and eight floors in height, with one common basement for each demarcated plot. BILT’s scope of contract consists of eight buildings located in Plots 2, 3, 4 & 7 as per the following details:

Plot Ref BUP (Sq.Mtrs) Type of Building Number of floors
Plot 2 48,873 Building L6-3A B+G+6 Floors+Roof
Building L7-3A B+G+6 Floors+Roof
Building L8-2 B+G+6 Floors+Roof
 Plot 3 23,402 Building L9-3A B+G+5 Floors+Roof
Building L10-3A B+G+5 Floors+Roof
Plot 4 21,151 Building L11-2 B+G+5 Floors+Roof
Plot 7 47,949 Building 14-2 B+G+6 Floors+Roof
Building 15-2 B+G+6 Floors+Roof

Bilt Middle East LLC is appointed to undertake the complete Air conditioning, HT & LV Electrical Systems, Low Current System, Plumbing, and Drainage & Fire Fighting Services. The following services were provided by Bilt Middle East LLC.¬† Supply, installation, warranty & guarantee, testing & commissioning of, maintenance and remedying defects of MEP works of Plot 2, 3, 4 & 7. The various MEP systems covered under BILT’s scope are listed below.

  • Air Conditioning & Ventilation system
  • Smoke Extract & Staircase Pressurization system
  • Car Park Ventilation system
  • Building Management system
  • Power & Lighting Distribution system
  • Voice & Data System
  • Fire Alarm system
  • Emergency Lighting System
  • CCTV System
  • Access Control System
  • Standby Generator
  • Domestic Water supply system
  • Drainage System
  • Automatic Sprinkler system
  • Fire Suppression System
  • Deluge Foam/Water

Light Fixtures & Sanitary Fixtures are under Client scope of supply.

Client/Consultant

Client : M/s. Meraas Holding
Consultants : M/s. Holford Associates / Hyder Consulting