The City Walk Residential Development is located in Al Wasl (near Jumeirah) Dubai, UAE, just west of Sheikh Zayed Road and Down Town Burj Khalifa.
The project occupies a land area of approximately 125hs and comprises 21 medium sized residential buildings constructed on 9 separate plots. The buildings which will be linked via a main promenade providing pedestrian access to retail units located on the ground floor of each building. Each building is between six and eight floors in height, with one common basement for each demarcated plot. BILT’s scope of contract consists of eight buildings located in Plots 2, 3, 4 & 7 as per the following details:
Plot Ref | BUP (Sq.Mtrs) | Type of Building | Number of floors |
Plot 2 | 48,873 | Building L6-3A | B+G+6 Floors+Roof |
Building L7-3A | B+G+6 Floors+Roof | ||
Building L8-2 | B+G+6 Floors+Roof | ||
Plot 3 | 23,402 | Building L9-3A | B+G+5 Floors+Roof |
Building L10-3A | B+G+5 Floors+Roof | ||
Plot 4 | 21,151 | Building L11-2 | B+G+5 Floors+Roof |
Plot 7 | 47,949 | Building 14-2 | B+G+6 Floors+Roof |
Building 15-2 | B+G+6 Floors+Roof |
Bilt Middle East LLC is appointed to undertake the complete Air conditioning, HT & LV Electrical Systems, Low Current System, Plumbing, and Drainage & Fire Fighting Services. The following services were provided by Bilt Middle East LLC. Supply, installation, warranty & guarantee, testing & commissioning of, maintenance and remedying defects of MEP works of Plot 2, 3, 4 & 7. The various MEP systems covered under BILT’s scope are listed below.
- Air Conditioning & Ventilation system
- Smoke Extract & Staircase Pressurization system
- Car Park Ventilation system
- Building Management system
- Power & Lighting Distribution system
- Voice & Data System
- Fire Alarm system
- Emergency Lighting System
- CCTV System
- Access Control System
- Standby Generator
- Domestic Water supply system
- Drainage System
- Automatic Sprinkler system
- Fire Suppression System
- Deluge Foam/Water
Light Fixtures & Sanitary Fixtures are under Client scope of supply.
Client/Consultant
Client : M/s. Meraas Holding
Consultants : M/s. Holford Associates / Hyder Consulting